Tandir Orthopedic Implants Tandir Orthopedic Implants

OEM Pandasolar GM4 Mg-Al-Zn High Strength Plating Solar Panel Ground Mounting System Structure Supplier

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information
Model NO. PD-GM-04 Certification CE
Application Commercial Material Steel
Type Ground Bracket Wind Speed 60m/S
Snow Load 1.4kn/M2 Lead Time 7-15 Days
Surface Treatment Magnesium Aluminum Zinc Standard AS/NZS1170/Jisc8955:2017
Transport Package Each Items Packed in Cartons, Several Cartons Pack
Packaging & Delivery
Package Size 1100.00cm * 1100.00cm * 2400.00cm
Package Gross Weight 100.000kg
Product Description

Magnesium Aluminum Zinc Ground Mounting Systems For Solar Panels:

The solar ground mounting bracket is strictly designed according to the maximum wind speed, maximum snow load, solar panel specifications and other design schemes. While ensuring sufficient strength, installation efficiency and labor costs must also be considered. It is necessary to control the cost and ensure the quality, so the service life of the bracket is very long. The support foundations are: straight into the ground, ground screws and cement piers.

GM4 double column can be ground bolt column or piling column. Ground screw posts allow for tiny height adjustments. The piling column strength is higher, and the requirements for installation accuracy are also higher.

Installation Process
Installing Ground Screws

1. Installing Ground Screws: The first step in installing a ground mount solar system is to install the ground screws. These screws are used to anchor the support structure to the ground. The screws are drilled into the soil using specialized equipment.

2. Install the Beams: After the foundation is ready, it's time to install the beams. Connect the diagonal support pole to the top of the pole using bolts and nuts securely.

Install the Beams
Installing Rails

3. Installing Rails: After the beams are in place, attach the rail that will support the solar panels. The rail should be attached to the beam using brackets and bolts. Ensure that the rail is level.

4. Installing Solar Panels: Finally, attach the solar panels to the rail using mounting hardware. Make sure that each panel is securely fastened to the rail.

Installing Solar Panels
Features & Advantages

Structural Features:

Simple double-column structure
High strength material
High self-healing properties
Cost-effective design
Aesthetic appearance

Our Advantages:

Highly pre-assembled parts
Great flexibility in designs
Extremely long service life
Accept OEM customization
Easy and fast installation
Technical Parameters
Material Structure: Mg-Al-Zn & AL-6005-T5 (Anodized)
Components: SUS304 & AI6005-5 (Anodized)
Application Commercial and Residential installation
Tilt Angle 0-60°
Wind Speed 0-60 m/s
Snow Load 0-150cm
Ground Clearance 0-1m
Design Standard AS/NZS 1170, DIN 1055, JIS C8955: 2017, IBC 2009
Warranty 12 years
Other Related Products
Solar Carport
One Pole Ground Mount
Agricultural Greenhouse
Factory & Production
Factory Overview

A professional design and sales team is committed to developing clean energy mounting systems, including ground, agriculture greenhouse, tile roof, metal roof, and carport systems.

Workshop - Aluminum Material:

Independent processing workshop for cutting, drilling, stamping, and forging. High customization and precision requirements are accepted.

Workshop - Steel Material:

Professional steel/Magnesium aluminum zinc processing with 6 production lines. Productivity reaches 40-50MW per month.

Certifications
Frequently Asked Questions
What is the typical delivery time for the mounting systems?
The standard lead time is approximately 7 to 15 days depending on the project scale and customization requirements.
Can I request samples for quality testing?
Yes, we provide free samples for your testing and evaluation to ensure they meet your project standards.
Do you offer OEM or customization services?
Absolutely. We have a professional production team that accepts products with high customization and precision requirements.
How long is the experience in solar mounting manufacturing?
We have more than 12 years of production experience in the solar clean energy mounting industry.
What materials are used for the ground mounting systems?
The systems primarily use high-strength Steel with Magnesium Aluminum Zinc surface treatment, along with AL-6005-T5 Aluminum and SUS304 components.
What is the warranty period for the products?
We offer a 12-year warranty on our mounting systems, reflecting their long service life and durability.

Related Products